Illustration for the Email Squad guide: How Long Does It Take to Design and Build an Email?

How long email design takes depends less on the designer than on the inputs: copy, assets, feedback and approvals. Coding and testing a template from a finished design is a matter of days. The calendar stretches when the brief is unclear or approvals drag.

How long does each stage of email design take?

There is no single number, and we found no reliable public benchmark for design time alone. This table shows what drives each stage and what evidence exists.

The table mixes sources and scopes, so treat it as a map of where time goes, not a quote.

What do surveys say about total production time?

The data describes in-house teams making one email, not an agency designing and building a template, so it is a context point, not a prediction. All of it comes from Litmus, an email testing vendor.

  • 2019: Reporting on Litmus’s State of Email Workflows survey of more than 3,000 marketers, MarketingProfs says 53% of respondents took more than two weeks to produce a marketing email, 24% about a week and 23% a few days or less.
  • 2023 to 2025: A Litmus blog post on AI workflows says its 2024 survey found 62% of teams needed two weeks or more for a single email, and that the figure fell to 6% in 2025. That is a large drop from a blog that promotes AI tools, so treat it with caution until you see the report.
  • Review time: Litmus says marketers spend an average of 3.9 hours getting an email reviewed and approved (its approvals page) and 4.2 hours gathering reviews and approvals (a January 2020 blog post), more than they spend on design or development. These are hours of effort, not calendar days.

How long does Email Squad take?

For a standard email, our typical turnaround is three to four working days once the copy and assets are final. That is in the same range as Everlytic’s three to five days for coding and testing a template from a finished design, though the two figures cover different scopes. Larger or more complex projects, such as a full template system or dynamic content with many states, take longer, and we scope them separately. The clock starts when your inputs are complete, and each round of feedback adds your response time to ours.

Why is elapsed time longer than working time?

Because work happens in short bursts between long waits. This is an illustrative example, not a quote: a designer needs two days of work to produce a layout. The client takes two days to give feedback, asks for changes, takes two more days to approve them, and a second reviewer then adds comments. Four days of effort become more than a week and a half on the calendar, and no one was idle on purpose. Every round of feedback adds a wait, not just an edit.

What makes email design take longer?

  • Copy that arrives after design starts. Layouts built on placeholder text get reworked when the real copy is longer, shorter or has a different structure.
  • Loose revision rules. Correcting supplied copy, changing a signed-off layout and replacing a whole creative direction are very different amounts of work. Agree what counts as a revision and how many rounds are included.
  • Complexity that hides in content. A single email with dynamic sections, several audience states and many product combinations can take more thinking than three simple promotional layouts. Count decisions, not screens.
  • Too many reviewers. Litmus says 40% of brands suffer review processes that are either too lax or too burdensome, and that approvals drag when too many or the wrong people are involved.
  • Rush work. A fast turnaround is realistic when inputs are final and approvals are decisive. It becomes expensive when urgency covers for an unclear brief.

How do you shorten the timeline?

  1. Freeze the copy and assets before design starts, or agree the maximum lengths up front.
  2. Name one approver and a short list of people who check specific things (legal, product, brand).
  3. Agree the number of rounds and the turnaround for feedback, such as 24 hours, in the scope.
  4. Give feedback in one place and in one batch, not as scattered comments.
  5. Build a reusable template once. The first email is the slow one. Later sends from a good template mostly need content, which is why a template is often worth the upfront time.

How should you ask a supplier for a timeline?

Ask for dates against each stage, and for the days they assume you will take to respond. A quote that says “two weeks” without stating your response times isn’t a plan. Ask what happens to the timeline if feedback arrives late, and whether rush turnaround costs extra. See what you should receive at the end in our guide to email design agency deliverables, and what drives price in our email design cost guide.

Need a realistic timeline for your email project?

Email Squad sells email design, HTML build, platform setup and QA, so we have an interest in you choosing us. Send us your brief and what you have ready, and we’ll tell you what is likely to hold it up. Our email campaign design and HTML email development services cover design and build, and our HTML email testing checklist shows how we handle QA.

Sources

Ready to take the production pain out of your email production timelines?

Bring us the brief, the platform and the awkward bits. We can turn your email production timelines into a reliable campaign or reusable system your team can actually work with.

Email Squad mascot pointing to the right

    Your Name*
    Your Email*

    Telephone*
    Company*

    Your Message*